products

Biogas Plant with 50 KW Electrical Power

Users


Farms or small industries requiring 24-hour energy availability in remote areas, enabling fuel savings for heating, electricity, and vehicles.


Components


Pre-charge agitator

Safety torch

Feed pump

Recirculation pump

Agitation pump

Hot water boiler

Low-pressure compressor

Electrical connections, electrical ducts

Sensor and valve connections

Clean water ducts

Feed ducts

Effluent ducts

Biogas ducts

Pre-charge tank

Effluent neutralization tank

Gas recovery tank

50 kW biogas-fueled electric generator

Biogas scrubber

Heated 150 m³ anaerobic reactor, constructed of metal, with recirculation, agitation, and temperature control

Biogas dryer

System of Temperature control

Air blower

Biogas blower

Hammer crusher


Includes


Custom design

Operating manual

Inoculum preparation for digester

Specialist site visit

Start-up and operation training

1 year of technical support


Requirements


12 tons of fresh cactus/day

2 workers for harvesting and feeding

Non-chlorinated water

Electric generator must be stopped for oil change every 48 hours of operation

Concrete foundation for equipment installation

Restrooms available for personnel


Products


50 kW of electrical power. 8,000 hours/year

Nitrogenous effluent can be used as fertilizer.a calefaccion electricidad y vehiculos

Biogas Plant with 500 KW Electrical Power

Users


Farms or medium-sized industries, small towns requiring 24-hour energy availability in remote areas; allows for fuel savings for heating, electricity, and vehicles; self-consumption system.


Components


Precharge agitator

Safety torch

Feed pump

Recirculation pumps

Agitation pumps

Hot water boiler

Low-pressure compressor

Electrical connections, electrical ducts

Sensor and valve connections

Clean water ducts

Feed ducts

Effluent ducts

Biogas ducts

Precharge tank

Effluent neutralization tank

Gas recovery tank

500 kW biogas-fueled generator

Biogas scrubber

Anaerobic reactor (two units), heated, 400 m³, metal construction, with recirculation, agitation, and temperature control

Biogas dryer

Temperature control system

Air blower

Biogas blower

Hammer crusher

Process room and Control

Storage Warehouse


Includes


Custom design

Operating manual

Inoculum preparation for digesters

Specialist site visit

Start-up and operation training

Technical support for 1 year


Requirements


86 tons of fresh cactus/day

4 workers for harvesting and feeding

Non-chlorinated water

Electric generator must be stopped for oil change every 48 hours of operation

Concrete slab for equipment installation

Restrooms available for personnel


Products


500 kW of electrical power. 8,000 hours/year

Nitrogenous effluent can be used as fertilizer.